AN ACT TO MAKE APPROPRIATIONS TO PROVIDE CAPITAL IMPROVEMENTS FOR STATE INSTITUTIONS, AGENCIES, AND DEPARTMENTS.

 

The General Assembly of North Carolina do enact:

 

Section 1.  This Act shall be known as the Capital Improvement Appropriation Act of 1963.

Sec. 2.  The funds appropriated by this Act are for the purposes of construction of buildings, acquiring sites therefor if necessary, acquiring and installing equipment at the institutions, departments, and agencies of the State, hereinafter mentioned.

Sec. 3.  The funds appropriated by this Act to provide for Capital Improvements, by Sections 4, 5, 6, 7, and 8 of this Act, shall be disbursed for the purposes provided in this Act upon warrants drawn by the State Disbursing Officer, which warrants shall not be drawn for any State institution, department, or agency until a requisition has been approved by the Director of the Budget and which requisition shall be approved only after full compliance with the Executive Budget Act, Article 1 of Chapter 143 of the General Statutes. Any officer of the State or executive head of any institution, or any director, trustee, or commissioner in any State institution, department, or agency to which an appropriation is made under the provisions of this Act who votes for or aids in spending more money for any improvement for his institution, department, or agency than is appropriated therefor, may be removed from office by the Governor. Any additional moneys which may be received by means of a grant or grants from the United States of America or any agency or department thereof or from any other source to aid in financing the cost of any of the improvements herein referred to, may be placed by the State Treasurer in the same fund or in a separate fund and, to the extent permitted by the terms of such grant or grants, shall be disbursed in the same manner and for the purposes mentioned in this Act.

Sec. 4.  There is appropriated out of the General Fund the sum of fifty seven million eight hundred ninety eight thousand five hundred eighteen dollars ($57,898,518*) for the use of the State institutions, departments, and agencies to provide for Capital Improvement projects according to the following schedule:

GENERAL GOVERNMENT

Department of Administration                                                                                        $5,276,000*

1. General Renovations                                                                $ 51,000

2. Install two Elevators, Agriculture Building                                    65,000

3. Elevator Conversion, Revenue Building                                       15,000*

4. New Office Building                                                               2,895,000

5. Purchase of Land                                                                   2,250,000*

PUBLIC SAFETY AND REGULATION

North Carolina Armory Commission                                                                                   200,000

1. Armory Buildings                                                                   1,600,000

Less: Federal and Local Funds                                               1,400,000

State Civil Defense Agency                                                                                              $ 257,500

1. Emergency Operating Center                                                  $ 515,000

Less: Federal Funds                                                                  257,500

CORRECTION

Stonewall Jackson Training School                                                                                         12 000

1. Replacement of Laying Houses

and Brooder House                                                                       9,000

2. Replacement of Silo for Dairy                                                        3,000

State Home and Industrial School for Girls                                                                          135,000

1. Renovate Electrical Distribution

System and Campus Lights                                                         15,000

2. Cottage for 25 Students                                                            115,000

3. Storage Shed                                                                                5,000

Morrison Training School                                                                                                    289,500

1. Annex to 35-Capacity Boys Dormitory

To Provide 12 Single Rooms with Custody

Features                                                                                     25,500

2. All Weather Surfaced Drives and Walks                                          -0-*

3. Fire Hydrants                                                                             12,000

4. Cottage to House 50 Students                                                   150,000

5. Two Staff Cottages                                                                     23,000

6. Addition to Infirmary                                                                   79,000

Eastern Carolina Training School                                                                                         414,500

1. New Building for 60 Students                                                    175,000

2. Renovation of Superintendents

Residence                                                                                     7,000

3. Extension of Water Lines and

Fire Hydrants                                                                                8,500

4. Extension of Walks and Drives                                                          -0-*

5. New Building for 60 Students                                                    175,000

6. Thirty Cow Milking Barn                                                              26,000

7. Two Staff Cottages                                                                      23,000

State Training School for Girls                                                                                             186,500*

1. All Weather Surfaced Walks and Drives                                           -0-*

2. New Building for 50 Students                                                    150,000

3. Two Staff Cottages                                                                      23,000

4. Residence for Superintendent                                                       13,500

State Prison Department                                                                                                  $1,665,000

Less: Funds Provided by Prison Enterprises                                   760,000                 $ 905,000

1. Construction of 6" Water Main

from Durham, Unit 051, Durham County                                      65,000

2. Sewage Outfall and Pumping Station

to City System, Unit 086,

Randolph County                                                                         17,000

3. Sewage Disposal System, Unit

112, Ashe County                                                                       24,000

4. Connect Sewer to City System,

Unit 136, Rutherford County                                                        13,000

5. Improvement to Unit 017, Hertford County                                  52,600

6. Improvements to Unit 022, Carteret County                                 27,400

7. Renovation of Craggy Prison                                                     276,000

8. Renovation and Enlargement of

Unit 024, Greene County                                                          905,000

9. Renovation and Enlargement of

Unit 132, Burke County                                                            166,000

10. Construction of 100-Man Dormitory

for Handicapped Inmates of

Caledonia Prison                                                                         88,000

11. Improvements at Odom Prison                                                     31,000

EDUCATION

University of North Carolina

(Consolidated)

General Administration                                                                                                           -0-*

1. Facilities to Provide Statewide

Educational Television                                                                      -0-*

University of North Carolina                                                                                              2,898,000

1. Renovate and Provide Basic

Equipment Ground Floor, MacNider Hall                                  155,000

2. Undergraduate Library and

Student Union                                                                        3,315,000

Less: Self-Liquidating Student Union                                           2,000,000                 1,315,000

3. L.R. Wilson Library, Renovation

and Air Conditioning 2 Areas                                                                                      65,000

4.Dormitory for 925* Men                                                         2,544,000*

Less: Self-Liquidating Funds                                                       2,544,000*

5. Additions and Alterations to Davie Hall                                                                    $ 903,000

6. Renovate Old Phillips Hall                                                      $ 460,000

7. Dormitory for 200 Women                                                               -0-*

(Combined with item 4 above)

Less: Self-Liquidating Funds                                                                 -0-*                         

State College of Agriculture and Engineering                                                                     3,988,000*

1. Improvements to Burlington Nuclear

Reactor Facilities; Rewiring

Ricks and Patterson Hall; and

other Building Repairs, Utilities

and Improvements                                                                 1,000,000

2. Additions and Alterations Brooks Hall                                       315,000

3. Remodel Daniels Hall                                                                325,000

4. Equipment for Civil Engineering                                                 100,000

5. Remodel Broughton Building (Diesel Wing)                                105,000

6. Renovate Nuclear Science Building                                               63,000

7. Air Conditioning D.H. Hill Library                                             300,000

8. Two Dormitories, 800 Men Each            4,400,000

Less: Self-Liquidating Funds                       4,400,000                          —

9. Dormitory for 300 Women                        825,000

Less: Self-Liquidating Funds                          825,000                          —

10. Physical Science Building                                                       1,780,000*

Woman's College of the University of

North Carolina                                                                                                          2,138,000*

1. Renovation and/or Replacement

of the Utility System; New

Boilers and Accessories                                                            773,000

2. Renovation of Electric Wiring

and Lighting in 7 Buildings                                                         370,000

3. Improvement of Hot Water

Supply in Dormitories                                                                  50,000

4. Widening West Drive                                                                   60,000

5. Dormitory Renovations                                                              300,000

6. Dining Hall Improvements                                                          200,000

7. Library Air Conditioning                                                            200,000

8. Two Home Management Units                                                    65,000

9. Additions and Alterations to Pool               160,000

Less: Self -Liquidating Funds                         $ 80,000                  $ 80,000

10. Nursery School Addition                                                            40,000*

East Carolina College                                                                                                   $3,116,000*

1. Dormitory for 400 Women to

Replace Wilson                                      1,100,000

Less: Self-Liquidating Funds                          588,000                   512,000

2. Addition to Library                                                                    519,000

3. Additions and Alterations to

Wright Building                                         650,000

Less: Self-Liquidating Funds                          650,000                         —

4. Addition to Jones Dormitory

Cafeteria                                                                                  157,000

5. Addition to Maintenance Shop                                                     28,000

6. Men's Health and Physical

Education Building                                  1,400,000

Less: Self-Liquidating Funds                          700,000                   700,000

7. Dormitory for 500 Men                          1,375,000

Less: Self-Liquidating Funds                       1,375,000                         —

8. Music Building                                                                       1,200,000*

The Agricultural and Technical College                                                                                737,000

1. Boiler, Piping and Equipment                                                     120,000

2. Campus Lights, Walks, and Roads                                               55,000

3. Dormitory for 200 Women                        550,000

Less: Self-Liquidating Funds                          412,500                   137,500

4. Renovation of Graham Building                                                  160,000

5. Student Union Building                            1,040,000

Less: Self-Liquidating Funds                       1,040,000                         —

6. Music and Art Building

Equipment                                                                                  25,000

7. Air Conditioning Library                                                            180,000

8. Farm and Dairy Additions                                                           59,500

Western Carolina College                                                                                                2,373,168*

1. Addition to Cafeteria                                                                 151,000

2. Cafeteria No. 2                                                                         768,000

3. College Union Building                            1,000,000

Less: Self-Liquidating Funds                       1,000,000                         —

4. Four 200 Student Dormitories               $2,200,000

Less: Self-Liquidating Funds                       2,200,000                         —

5. Renovations, Alterations, and

Additions to Stillwell Building                                                 $ 135,000

6. Additions and Alterations to

Water System                                                                           270,000

7. Expansion of Utilities                                                                 200,000

8. Walks, Drives, and Landscaping                                                 25,000

9. Additions and Alterations to

Hunter Library                                                                          503,000*

10. Campus Laboratory School

and Equipment                                                                          321,168*

Appalachian State Teachers College                                                                             $3,479,050*

1. Dormitory for 300 Women to

Replace Lovill Hall                                    825,000

Less: Self-Liquidating Funds                          440,000                   385,000

2. Dormitory for 200 Women to

Replace White Hall                                   406,300

Less: Self-Liquidating Funds                          165,000                   241,300

3. Repairs to Power Plant and

Distribution System, Replacements

for Steam Heating System and

Purchase of Boilers                                                                    90,000

4. Replacement and Enlargement of

Facilities for Health and

Physical Education                                 1,137,000

Less: Self-Liquidating Funds                          284,250*                 852,750*

5. Renovate Old Science Building

and Convert to Different Type

of Classroom Use                                                                      75,000

6. Furniture and Equipment for Old

Science Building                                                                         36,000

7. Seats for Auditorium in

Administration Building                                                               14,000

8. Addition to Expansion of Present

Cafeteria                                                                                  698,000

9. Equipment for New Science

Building                                                                                    125,000

10. Student Center                                       1,025,000

Less: Self-Liquidating Funds                         1,025,000                      —

11. Enlargement of Library Facilities                                                890,000

12. Dormitory for 300 Women                        825,000

Less: Self-Liquidating Funds                            825,000                      —

13. Dormitory for 300 Men                          $ 825,000

Less: Self-Liquidating Funds                            825,000                      —

14. Nursery School Building                                                          $ 72,000*

Pembroke State College                                                                                                  $ 953,750*

1. Dormitory for 100 Women                        275,000

Less: Self-Liquidating Funds                            68,750                   206,250

2. Student Center                                          120,000

Less: Self-Liquidating Funds                               -0-*                    120,000*

3. Band Room                                                                                47,000

4. Two Wings at Library                                                                 38,000

5. New Wing and Alterations to Gymnasium                                   85,000

6. Home Economics Residence

House                                                                                        45,000

7. Dormitory for 100 Men                             275,000

Less: Self-Liquidating Funds                            68,750                   206,250

8. Faculty Apartments                                    140,000

Less: Self-Liquidating Funds                          140,000                      —

9. Dormitory for 100 Women                        275,000

Less: Self-Liquidating Funds                            68,750                   206,250*

Winston-Salem Teachers College                                                                                        497,000*

1. Convert Bickett Dormitory to Use

by Women                                                                                 30,000

2. Dormitory for 250 Men                             687,500

Less: Self-Liquidating Funds                          515,500                   172,000

3. Library Building                                                                         295,000*

Fayetteville State Teachers College                                                                                       644,500

1. Dormitory for 200 Women                        550,000

Less: Self-Liquidating Funds                          412,500                   137,500

2. Campus Drainage and Widen

West Drive                                                                                95,000

3. Redecorate President's House                                                      5,000

4. Dormitory for 250 Men                             687,500

Less: Self-Liquidating Funds                          515,500                   172,000

5. Physical Education Building for Women,

Including Swimming Pool                           470,000

Less: Self-Liquidating Funds                       $ 235,000                $ 235,000

6. Student Center                                          460,000

Less: Self-Liquidating Funds                          460,000                     

Elizabeth City State Teachers College                                                                              $ 777,250*

1. Dormitory for 300 Men                             825,000

Less: Self-Liquidating Funds                          618,750                   206,250*

2. Student Center                                          393,000

Less: Self-Liquidating Funds                          393,000                      —

3. Swimming Pool                                          242,000

Less: Self-Liquidating Funds                          121,000                   121,000

4. Library                                                                                      400,000*

5. Renovations of Old Library

Building for Food Service                                                           50,000*

North Carolina College at Durham                                                                                   1,153,500*

1. Improvements to New Women's

Dormitory                                                                                  15,000

2. Repairs to Women's Dormitory                                                    8,500

3. Renovate Administration Building                                               160,000

4. Sidewalks and Seat Walls for

Congested Areas                                                                         9,000

5. Elevator, Health Building                                                             15,000

6. Culvert and Fill, Dupree to

Lawson Streets                                                                          35,000

7. Air Condition Library                                                                100,000

8. Enlarge Coal Bin                                                                         14,000

9. Student Center                                          720,000

Less: Self-Liquidating Funds                          360,000*                 360,000*

10. Dormitory for 400 Women                     1,100,000

Less: Self-Liquidating Funds                       1,100,000                      —

11. Dormitory for 400 Men                             825,000

Less: Self-Liquidating Funds                          825,000                      —

12. Listening Room                                                                          49,000

13. Storage Building                                                                         25,000

14. Equipment for Closed Circuit

Television                                                                                   75,000

15. Addition to Science Building                                                     288,000*

Community Colleges

Asheville Biltmore College                                                                                           $1,406,000

1. Convert Chemistry Lecture Hall

to Laboratory                                            $ 16,000

Less: Local Matching Funds                                    -0-*                $ 16,000*

2. Library Building                                         800,000

Less: Local Matching Funds                                    -0-*                800,000*

3. Convert Present Library Space

to Classrooms and Offices                          40,000

Less: Local Matching Funds                                    -0-*                   40,000*

4. General Classroom Building                       550,000

Less: Local Matching Funds                                    -0-*                550,000*

College of the Albemarle                                                                                                     260,000*

1. Gymnasium                                                260,000

Less: Local Matching Funds                           130,000                   130,000

2. To match Local Funds Already

Contributed                                                                              130,000*

Charlotte College                                                                                                           3,300,000*

1. General Classroom Building                    1,200,000

Less: Local Matching Funds                                    -0-*             1,200,000*

2. General Laboratory Building                   1,610,000

Less: Local Matching Funds                                    -0-*             1,610,000*

3. Administration Building                              490,000

Less: Local Matching Funds                                    -0-*                490,000

4. Addition to Student Center                        512,000

Less: Local Matching Funds                           512,000                     

Mecklenburg College                                                                                                          255,000

1. Library Building                                         215,000

Less: Local Matching Funds                           107,500                   107,500

2. Classroom Building                                    295,000

Less: Local Matching Funds                           147,500                   147,500

3. Student Services Building                           230,000

Less: Local Matching Funds                           230,000                     

Wilmington College                                                                                                             500,000*

1. Liberal Arts Building                                  500,000

Less: Local Matching Funds                                    -0-*                500,000*

Gaston College                                                                                                                $ 500,000*

1. Two multi-purpose Buildings                 $1,000,000

Less: Local Matching Funds                           500,000                $ 500,000*

State School for the Blind and the Deaf                                                                               726,000

1. Primary Unit, Negro School                                                      512,000

2. Addition to Primary Unit,

White School                                                                            183,000

3. Water Main Connection with

City of Raleigh                                                                           25,000

4. Additional Freezer Storage Space                                                6,000

Eastern North Carolina School for the Deaf                                                                         980,000*

1. Renovation of Existing Buildings                                                       -0-*

2. Site Preparations                                                                             -0-*

3. Classroom and Dining Room Building                                              -0-*

4. Primary Unit, Classroom, Dining

Room, Kitchen, Dormitory, Recreation

and House-parent Quarters — 120 Capacity                            883,000*

5. Renovations of Existing Buildings                                                 30,000*

6. Site Improvements — Utilities                                                     67,000*

North Carolina School for the Deaf                                                                                        65,000

1. Renovate Bathrooms, Goodwin Hall                                           65,000

Department of Archives and History                                                                                  3,050,000

1. Building to House the Department

of Archives and History

and State Library                                                                   3,000,000

2. Security Vault                                                                             50,000

NON-HIGHWAY TRANSPORTATION

State Ports Authority                                                                                                         4,600,000

1. Wilmington Harbor Project                                                        100,000

2. Construction of New and

Renovation of Present Facilities,

Morehead City and Wilmington                                              4,500,000

3. Morehead City Port Improvements

Supplement                                            1,225,000

Less: Federal Funds, HHFA                       1,225,000                     

HEALTH AND HOSPITALS

Medical Care Commission                                                                                               $2,000,000

1. Community Hospitals                            $2,222,000

Less: Federal Matching                               1,222,000              $1,000,000

2. Nursing Home Facilities                          1,333,000

Less: Federal Matching                                  733,000                   600,000

3. Mental Health Clinics                                 889,000

Less: Federal Matching                                  489,000                   400,000

Dorothea Dix Hospital                                                                                                       1,245,000

1. Renovation of Kirby Building                                                     185,000

2. Renovation of Council Building                                                  185,000

3. Renovation of McBryde Building                                                 55,000

4. Spruill Building Improvements                                                     25,000

5. Roads, Sidewalks and Parking Areas                                        100,000

6. Harvey Building Roofing and

Waterproofing Exterior Walls                                                     18,000

7. Royster Building Roofing and

Waterproofing Exterior Walls                                                     18,000

8. Completion of Electrical

Distribution System                                                                   100,000

9. Renovation of Wright Building                                                     80,000

10. Renovation of Edgerton Building                                               155,000

11. Renovation of Adams Building                                                  185,000

12. Renovation of Williams Building                                                120,000

13. Two Poultry Houses                                                                   19,000

Broughton Hospital                                                                                                           1,346,000

1. Renovate Wards 6, 7, 8, 10, 11,

12, F, G, H, J, K, and M                                                          430,000

2. Renovate Wards 36 and 37                                                       130,000

3. Renovate TB Building                                                                 35,000

4. Hydraulic Lift, Ward 28                                                              20,000

5. Repairs to Service Building                                                         13,000

6. Air Condition Jones Building                                                      225,000

7. Air Condition Wards N and 27                                                 100,000

8. Two Elevators, Center Building                                                   50,000

9. Roads and Parking Areas                                                           45,000

10. Paging and Broadcasting System                                                60,000

11. Chapel                                                                                     220,000

12. Water Line Pump and Pump House                                            18,000

Cherry Hospital                                                                                                               $1,064,000

1. Electrical Distribution System                                                  $ 150,000

2. Repair and Renovate 14 Bath and

Toilet Areas in 4 Buildings at

O'Berry Section                                                                         40,000

3. Additional Overhead Water

Storage Tank                                                                             82,000

4. Sewage Disposal Plant                                                              390,000

5. Enclosing Stairwells on

Breezeways of All Buildings                                                        30,000

6. Protection and Detention Screens                                              100,000

7. Hot Water Heating and Storage                                                  15,000

8. Paving Streets                                                                             57,000

9. Filter Plant Addition                                                                  200,000

O'Berry School                                                                                                                    579,000

1. Swimming Pool                                                                           70,000

2. Recreation Field and Field House                                                16,000

3. 126-Bed Crippled Children

Hospital                                                                                    440,000

4. Canteen                                                                                      26,000

5. Storage Building                                                                         27,000

John Umstead Hospital                                                                                                         773,000

1. Renovate Central Heating Facilities                                            360,000

2. Repair of Cold Storage                                                               70,000

3. Air Condition Day Rooms

and Medical and Surgical Wards                                               335,000

4. Improvements to Main Kitchen                                                      8,000

Murdoch School                                                                                                              1,243,400*

1. Forty Bed Addition to Infirmary                                                 210,000

2. Warehouse Addition to Kitchen

Building                                                                                    108,000

3. Canteen                                                                                      26,000

4. Outdoor Swimming Pool                                                             70,000

5. Air Condition Crippled Children's

Building and Administration Building                                           45,000

6. Convert 12 Two-Room Apartments

to Efficiency Units (Staff Building)                                               20,000

7. Facility for Blind Retardates                                                       764,400*

Caswell School                                                                                                                    534,000

1. New Floors in Crippled Children's Building                                 24,000

2. Exterior Repairs to Pollock, Austin,

Wooten, and Old Kitchen Buildings                                         $ 12,000

3. Heating Renovations, Idiot Colonies                                          125,000

4. Sewage Disposal Plant, or

Participation with City of Kinston                                              325,000

5. Covered Walks                                                                          22,000

6. Canteen or Store for Children and Employees                             26,000

North Carolina Orthopedic Hospital                                                                                    $ 38,000

1. Electrical Improvements                                                              15,000

2. Air Conditioning                                                                           7,000

3. Emergency Power System                                                            4,000

4. Resurface Roads and Widen Main Drive                                     12,000

NATURAL RESOURCES AND RECREATION

Department of Conservation and

Development                                                                                                                   1,371,500*

Parks Division:

Cliffs of the Neuse State Park

1. Land Acquisition                                                                         39,500

2. Enlargement of Water Supply

System                                                                                       27,000

Fort Macon State Park

1. Additions to Maintenance and

Service Area                                                                              30,500

2. Beach Erosion Control                                                              260,000

Hanging Rock State Park

1. Replacement of Underground

Power Cable                                                                              21,000

2. Resurfacing and Improvements

of Park Roads                                                                            23,000

3. Additions to Maintenance and

Service Area                                                                              27,500

4. Enlargement of Public

Campgrounds                                                                            33,000

Jones Lake State Park

1. Replace Bathhouse                                                                     40,500

Morrow Mountain State Park

1. Additions to Maintenance and

Service Area                                                                              19,000

2. Enlargement of Public Camp

Grounds                                                                                     33,000

Mount Jefferson State Park

1. Maintenance and Service Area                                                 $ 28,450*

2. Enlargement of Water Supply

System                                                                                        5,000

Mount Mitchell State Park

1. Roadside Improvement                                                               51,550*

2. Completion of Parking Areas                                                      31,000

3. Addition to Toilets and Refreshment

Stand                                                                                         43,500

4. Addition to Maintenance and

Service Area                                                                              14,000

5. Enlargement of Public Camp

Grounds                                                                                     48,500

Reedy Creek State Park

1. Addition to Maintenance and

Service Area                                                                                  20,500

William B. Umstead State Park

1. Enlargement of Water Supply

System                                                                                           22,000

2. Additions to Maintenance and

Service Area                                                                                  38,500

Duke Power State Park                                                                      150,000*

Forestry Division

1. 120 Foot Steel Lookout Tower

Erection, Pamlico County                                                                5,000

2. Fairfield District Headquarters,

Hyde County                                                                               46,000

3. Shop Building, Equipment Shelter,

Airplane Hanger, Whiteville                                                          40,000

4. Forest Fire Control Equipment,

Clayton                                                                                       12,500

5. Equipment Shelter and Radio

Shop, Chapel Hill                                                                        17,500

6. Warehouse and Shop Building,

Sylva                                                                                           52,500

7. Equipment Shelters; Bertie,

Columbus, Martin, and

Robeson Counties                                                                       38,000

8. District Headquarters,

Rockingham                                                                                61,000

9. District Headquarters, Elizabeth

City                                                                                             58,500

10. Equipment Shelter and

Communications Dispatch Building,

New Bern                                                                                   12,000

11. Replace Inside Ladders with Steel

Stairs, Ashe and Yancey Counties                                                   1,500

12. One Steel Lookout Tower

(Robeson County)                                                                    $ 10,000*

13. Residence, Sampson County                                                        10,000*

                                                                                               __________

 

Kerr Reservoir Development

Commission                                                                                                                       $ 132,600

Kimball Point

1. Ranger's Residence                                                                      11,000

2. Toilet Building                                                                                 7,000

3. Tent Camping Area                                                                         8,000

4. Central Wash House                                                                       9,500

County Line Point

1. Tent Camping Area                                                                       10,000

2. Central Wash House                                                                       9,500

3. Toilet Building                                                                                 5,500

Bullocksville Park

1. Toilet Building                                                                                 5,500

2. Swimming Dock                                                                              1,000

3. Two Deep Wells with Pumps                                                          4,000

Satterwhite Point

1. Toilet Building at

Swimming Area                                                                              8,000

2. Swimming Float                                                                              1,000

3. Toilet Building at

Picnic Shelter 1                                                                               7,000

4. Sales and Shop Building                                                                22,000

5. Public Boat Dock                                                                            1,000

6. Exterior Lighting                                                                              1,100

Flemingtown Road Marina

1. Central Wash House                                                                       9,500

Williamsboro Wayside

1. Deep Well and Parking Area                                                           4,000

Park Improvements

1. 200 Picnic Tables                                                                            2,000

2. Ground Improvements                                                                     6,000

__________

Department of Water Resources                                                                                      1,000,000*

1. Building Sand Dunes and Other

Civil Works Projects                                                               1,000,000

__________

AGRICULTURE

1. Addition to Tobacco Packhouse,

Border Belt Tobacco Research

Station                                                                                            7,625

2. Milking House, Mountain

Research Station                                                                           13,280

3. Addition to Implement Storage,

Border Belt Tobacco Research

Station                                                                                         $ 5,075

4. Feed Mixing and Storage

Facility, Piedmont Research Station                                               17,100

5. Superintendent's Dwelling, Upper

Coastal Plain Research Station                                                      17,050

6. Feed Mixing and Storage Facility,

Tidewater Research Station                                                          13,200

7. Sheltering Barn and Hay Feeding

Area, Coastal Plain Research Station                                              9,650

8. Fertilizer and Pesticide Storage,

Peanut Belt Research Station                                                          4,925

9. Shed for Experimental Peanut

Curing Units, Peanut Belt

Research Station                                                                             2,350

10. Superintendent's Dwelling

Upper Mountain Research Station                                               17,050

11. Swine Unit, Upper Coastal

Plain Research Station                                                                 20,300

12. Dairy Supervisor's Dwelling,

Piedmont Research Station                                                          13,900

13. Tobacco Curing Barn, Border

Belt Tobacco Research Station                                                      4,275

14. Apple Grading Shed,

Mountain Research Station                                                            4,770

15. Building for Wintering Brood

Cows, Upper Mountain Research

Station                                                                                          8,935

16. Silo (40 ton capacity) for Sheep

Feeding, Upper Mountain Research

Station                                                                                          2,315

__________

Agricultural Experiment Station,

North Carolina State College                                                                                  $ 337,000*

1. Modernizing Dairy Farm Facilities,

College Dairy Farm                                                                        9,000

2. Buildings for Horticulture Crops

Research Station, Castle Hayne                                                    16,000

3. Buildings at Mountain Horticulture

Crops Research Station, Fletcher                                                  52,000

4. Buildings at Sandhills Research

Station, Jackson Springs                                                               16,000

5. Compartment Curing Barn, Upper

Piedmont Tobacco Research

Station, Reidsville                                                                        $ 6,000

6. Finley Farm Poultry Facility                                                       238,000*

                                                                                              ___________

Sec. 5.  There is appropriated out of the Highway Fund the sum of three million two hundred seventy-six thousand two hundred dollars ($3,276,200) for the use of the Department of Motor Vehicles and the State Highway Commission to provide for Capital Improvement projects according to the following schedule:

PUBLIC SAFETY AND REGULATION

Department of Motor Vehicles                                                                                           $ 691,900

1. Addition to Motor Vehicles Building,

Raleigh 65,000

2. Radio Towers and Equipment —

Smithfield, Dunn, Stedman,

Fayetteville, Wilson and Greenville                                              312,500

3. Office Building — Conover                                                           52,400

4. Office Building — Bryson City                                                      52,400

5. Office Building — Statesville                                                         52,400

6. Office Building — Reidsville                                                          52,400

7. Office Building — Waynesville                                                      52,400

8. Office Building — Marion                                                             52,400

                                                                                                  _________

HIGHWAYS

State Highway Commission:                                                                                               2,584,300

1. Division Shop — Asheville                                                          175,000

2. District Office Building — Winston Salem                                      34,000

3. District Office Building — Greenville                                              34,000

4. District Office Building — Greensboro                                           34,000

5. Addition to 11th Division Office

Building — North Wilkesboro                                                      32,500

6. Maintenance Building — Burke County                                         60,000

7. Headquarters Building for

Resident Engineer and Locating

Engineer — Sanford                                                                     34,000

8. Maintenance Yard Facilities — Halifax County                              43,000

9. District Office and Land — Boone                                                47,000

10. Four (4) Washing and Greasing

Houses — Division 5                                                                128,000

11. Service Station at Union

County Maintenance Yard                                                          $ 7,000

12. District Office Building — Asheville                                               34,000

13. Maintenance Headquarters Building — Trenton                             10,000

14. Road Oil Camp (30 men) — Wilmington                                      13,000

15. Office, Storage, and Truck

Shed Building — Marshall                                                           18,500

16. Addition to Division Office

Building — Durham                                                                     22,000

17. Maintenance Headquarters

Building — Pamlico County                                                         10,000

18. Assembly Building and Fencing — Union

County Maintenance Yard                                                           14,500

19. Road Oil Camp (50 men) — Buncombe

County                                                                                        25,000

20. Office and Storage Building — Webster                                        10,000

21. District Office Building and Land — Wilson                                  38,000

22. Maintenance Headquarters Building

and Fencing — Fayetteville                                                         20,000

23. Service Station — Fayetteville                                                        7,000

24. Maintenance Headquarters Building — Graham                            13,000

25. Sub-Shop — Greenville                                                                25,000

26. Sub-Shop and Fencing — Yadkinville                                           32,000

27. Office Building, Truck Shed and

Storage Building — Point Harbor                                                22,000

28. Wash Pit and Grease Rack Shed — Wadesboro                            7,000

29. Service Building with Grease Pit and

Wash Pit — Avery County                                                          13,000

30. Service Building with Grease

Pit and Wash Pit — Webster                                                        8,000

31. Road Oil Camp (25 men) — Clinton                                             11,000

32. Maintenance Yard Building and

Fencing — Edgecombe County                                                   37,000

33. Maintenance Quarters, Resident

Engineer's Office and Service

Station — Siler City                                                                    28,000

34. Sub-Shop and Fencing — Asheboro                                            32,000

35. Metal Equipment Storage Shed — Webster                               $ 12,500

36. Metal Equipment Storage

Building — Trenton                                                                     13,500

37. Storage Building — Cleveland

Gaston County                                                                            16,000

38. Office Building and Storage

Building — Sanford Bridge Yard                                                 16,000

39. Maintenance Office and Assembly

Room — Burgaw                                                                        10,000

40. Metal Equipment Storage

Shed — Pamlico County                                                             13,500

41. Maintenance Office and Assembly

Room — Kenansville                                                                  14,000

42. Purchase of Land

(20 acres) — Chatham County                                                    29,200

43. Purchase of Land from Prison Department

(23 acres) — Perquimans County                                                  1,400

44. Purchase of Land from Prison Department

(6 acres) — Northampton County                                                 7,300

45. Assembly Building, Truck Shed, Service

Station and Fencing — Pasquotank County                                 36,000

46. Metal Equipment Shed — Statesville                                             13,500

47. Truck Shed, Storage, Toilet

and Assembly Building — Swan Quarter                                    15,000

48. Service Station Building — Trenton                                                 1,500

49. Fencing — Burke County                                                               3,000

50. Road Oil Camp

(50 men) — McDowell County                                                   25,000

51. Service Building for Washing and

Greasing — Robbinsville                                                               8,000

52. Sub-Shop — Bryson City                                                             32,000

53. Maintenance and Storage

Building and Sign

Shop — Wilson County                                                              59,000

54. Office Building — Storage Building,

Grading, and Fencing — North Wilkesboro                                 22,500

55. Storage Shed and Addition to

Office — Guilford County                                                           10,000

56. Headquarters Building — Greenville                                              10,000

57. Storage Building — Boone                                                        $ 16,000

58. Road Oil Camp (50 men) — Yancey County                                25,000

59. Blacksmith Shop and Storage

Building — Fayetteville                                                                13,000

60. Equipment Storage Shed — Webster                                            19,000

61. Fencing — Chowan County                                                            2,600

62. Metal Service Building for Washing

and Greasing — Mt. Pleasant                                                        4,500

63. Sub-Shop — Roxboro                                                                 32,000

64. Truck Shed — Fayetteville                                                           20,000

65. Seed and Fertilizer

Building — Greenville                                                                    8,500

66. Storage Warehouse — Rockingham                                               8,500

67. Warehouse — Rockingham                                                            9,000

68. Division and District Headquarters

Office Building — Albemarle                                                     122,000

69. Service Building for Washing

and Greasing — Monroe                                                               7,500

70. Bridge Maintenance Office

Building and Truck Shed — Spindale                                          15,000

71. Combination Lumber and Storage

Shed — Rockingham                                                                    5,600

72. Landscape Headquarters and

Storage Building — Camp

Burton — Greensboro                                                                17,000

73. Metal Equipment Storage Shed — Rosman                                   12,500

74. Maintenance Headquarters and

Fencing — Whiteville                                                                  22,500

75. Metal Truck Shed — Asheboro                                                    12,500

76. Metal Truck Shed and

Division Sign Shop — Union County                                           18,500

77. Metal Building to Cover

Wash and Grease Racks — Albemarle                                          7,000

78. Double Wall Frame

Building — Mt. Pleasant                                                                3,000

79. Metal Storage

Building — Warrensville                                                              14,500

80. Sub-Shop — Jacksonville                                                             32,000

81. Maintenance Storage

Shed — Alamance County                                                            6,000

82. Truck Shed — Landscape

Department — Greenville                                                              5,500

83. Office and Metal Equipment

Storage Shed — Hazelwood                                                       19,000

84. Maintenance Quarters — Asheboro                                           $ 20,000

85. Truck Shed — Bridge Maintenance

Yard— Troy                                                                                 5,000

86. Equipment and Material

Storage Shed — Avery County                                                   16,000

87. Service Station — Whiteville                                                           7,000

88. Sub-Shop— Hillsboro                                                                  32,000

89. Equipment and Material Storage

Shed — Wentworth                                                                      2,000

90. Truck Storage Shed — Guilford

County                                                                                          6,000

91. Storage Building — Bridge

Maintenance Yard — Troy                                                           8,000

92. Truck Shed — Shelmerdine — Pitt

County                                                                                          4,500

93. Material and Equipment

Storage Sheds — Elkin, Yadkinville

and Dobsonville                                                                          14,500

94. Metal Truck Shed — Siler City                                                       6,000

95. Maintenance Office and

Storage Building — Columbus

County                                                                                          7,000

96. Truck Shed — Bridge Maintenance

Yard — Peachtree                                                                        4,500

97. Truck Shed — Maury — Greene

County                                                                                        18,500

98. Building for Washing and

Greasing — Hayesville                                                                10,000

99. Warehouse Building — Troy                                                           9,500

100. Concrete Block Blacksmith

Shop — Hazelwood                                                                  2,500

101. Masonry Storage Building — Bridge

Maintenance Yard — Peachtree                                                 5,000

102. Oil, Grease and Wash

Building — Troy                                                                        6,500

103. Metal Storage Building

North Wilkesboro                                                                    14,500

104. Chain Link Fence — Pamlico

County                                                                                       3,000

105. Metal Equipment Storage

Shed — Hendersonville                                                            12,500

106. Bridge Maintenance Office

Building — Kenansville                                                            10,000

107. Oil, Grease and Washing

Building — Rockingham                                                             6,500

108. Storage Building — Caldwell

County                                                                                     16,000

109. Bridge Maintenance

Truck Shed — Kenansville                                                      $ 4,500

110. Chain Link Fence — Trenton                                                         4,500

111. Cyclone Fencing — Carthage                                                         5,000

112. Metal Equipment Storage

Shed Columbus                                                                        12,500

113. Oil, Grease and Washing

Building, Wagram                                                                       6,500

114. Washing and Greasing Building,

Franklin                                                                                   10,000

115. Metal Equipment Storage

Shed — Franklin                                                                      12,500

116. Filling Station and Maintenance

Quarters — Troy                                                                     16,000

117. Filling Station and Maintenance

Quarters — Rockingham                                                          16,000

118. Bridge Maintenance Storage

Building — Kenansville                                                              7,500

119. Truck Shed — Rockingham                                                         17,500

120. Truck Shed — Troy 18,500

121. Chain Link Fence — Greenville                                                      4,500

122. Chain Link Fence — Aurora                                                          2,300

123. Storage Warehouse— Carthage                                                     8,500

124. Maintenance Quarters, Oil House and

Service Station — Sanford                                                       17,000

125. Three (3) 10-Stall Truck Sheds

Carthage, Siler City and Wagram                                             47,500

126. New Bridge Maintenance

Yard — Graham                                                                      25,000

127. Chain Link Fence — Vanceboro                                                    3,500

128. Chain Link Fence — Maury                                                           2,000

129. Chain Link Fence — Chelmerdine                                                  2,400

130. Bridge Maintenance Office, Storage

and Truck Shed — Buxton                                                       18,500

131. Equipment Service Building — Greenville                                       6,500

132. Equipment Service Building

— Washington                                                                           6,500

133. Equipment Service Building — Kinston                                           6,500

134. Bridge Maintenance Storage

Building — Charlotte                                                                15,000

135. Equipment Service Building

— New Bern                                                                             6,500

136. Bridge Maintenance Office

Building — Hendersonville                                                       22,500

137. Bridge Maintenance Office

Building — Hazelwood                                                            10,000

138. Bridge Maintenance Office

Building — Whittier                                                               $ 10,000

139. Bridge Maintenance Office

Building — Creswell                                                                10,000

140. Bridge Maintenance Truck

Shed — Hudson                                                                      10,500

141. Bridge Maintenance Truck

Shed — Tarboro                                                                       4,500

142. Bridge Maintenance Office

Building —Elizabeth City                                                          21,000

143. Bridge Maintenance Masonry

Lumber Shed — Newton                                                           7,500

144. Bridge Maintenance Masonry

Lumber Shed — Statesville                                                        7,500

145. Purchase of Land — Lee County                                                   5,000

                                                                                                  _________

Sec. 6.  There is appropriated out of the Prison Enterprises Fund the sum of seven hundred sixty thousand dollars ($760,000) to provide for part of the costs of Capital Improvement projects as detailed under State Prison Department in Section 4 of this Act.

Sec. 7.  There is appropriated out of the Enterprises account of the University of North Carolina the sum of two million two hundred fifty thousand dollars ($2,250,000) to provide for Capital Improvement projects according to the following schedule:

EDUCATION

University of North Carolina

Enterprises                                                                                                                      $2,250,000

1. Addition to Heating Plant and

Steam Piping System                                                              1,380,000

2. Plant and Utilities —

Improvements                                                                           870,000

                                                                                                    __________

Sec. 8.  There is appropriated out of the Wildlife Resources Fund the sum of two hundred forty-six thousand two hundred fifty-four dollars ($246,254) to provide for Capital Improvements projects according to the following schedule:

NATURAL RESOURCES AND RECREATION

Wildlife Resources Commission                                                                                            246,254

1. Additional Facilities — Armstrong

Creek Fish Hatchery                                                                   50,000

2. Purchase of Land                                                                       178,254

3. Purchase of Fishing Access Areas                                                15,000

4. Equipment Shed and Garage at

the Caswell Wildlife Refuge Area                                                    3,000

                                                                                             _________

Sec. 9.  The Director of the Budget is authorized and empowered to make transfers and changes between appropriations made in this Act, within the appropriations made to each separately named agency or institution, to provide changes to permit completion of the projects as described in this appropriation.

Sec. 10.  Subject to any transfers and changes between appropriations as permitted in Section 9 of this Act, the appropriations for Capital Improvements made in this Act shall be expended only for the specific projects set out in this Act, and any unexpended balances of the appropriations made in this Act to each separately named agency or institution shall revert to the General Fund of the State on June 30, 1968 or on such later date, if any, as the Advisory Budget Commission may determine, or upon completion of the projects of such agency or institution if prior to June 30, 1968 or such later date.

Sec. 11.  The unexpended balances remaining in various Capital Improvement Funds of 1947, 1949, 1951, and 1953 shall revert to the General Fund on June 30, 1963.

Sec. 12.  The several institutions and departments of the State are fully authorized and empowered to make application or applications to any agency or agencies of the United States of America for grants-in-aid for the construction of the several purposes mentioned in this Act and to receive and expend the same in accordance with the terms of such grants and in conformity with the laws of this State. The Governor, or such agency or persons as may be designated by him, is fully authorized and empowered to make applications to and receive such grants-in-aid as may be made by any agency or agencies of the United States of America for the construction and renovation of buildings, and equipping the same, and the improvements referred to in this Act.

Sec. 13.  All laws and clauses of laws in conflict with this Act are hereby repealed.

Sec. 14.  This Act shall be effective upon and after its ratification.